Welcome to MainGate Shipping LLC

Phone Number
+254784622091
Send us mail
ops@maingateshipping.com
Visit our location
Moi Avenue Road, Mombasa
Visit our location
Moi Avenue Road, Mombasa
Send us mail
ops@maingateshipping.com
Phone Number
+254784622091

Crew Changes at Maputo, Mozambique: Immigration, Airport and Gangway on One Instruction

Crew logistics

Crew Changes at Maputo, Mozambique: Immigration, Airport and Gangway on One Instruction

Joining and leaving crew at Maputo, Mozambique, move through Maputo International Airport to the gangway or the launch on one instruction to Maingate Shipping, with the file cleared before the flight is bought. Attendance is by our partner agent under Maingate's instruction; the Mombasa desk plans the movement and reports it.

Nominate MaingateWhatsApp the deskContact

Maingate Shipping at Mombasa
PortMaputo
AirportMaputo International Airport
Crew changesRoutine
Anchorage changesBy launch, daylight

Crew change at Maputo is a routine movement: the airport is Maputo International Airport, close to the port, and the port accepts crew changes at berth and by launch at the anchorage. What decides whether the change goes smoothly is the file: passports, seaman's books, the crew list, the agent's letter of guarantee and the visa position for each nationality, all confirmed before the flight is bought.

Maingate Shipping runs the crew change whether or not we are the cargo agent for the call. Managers who use a charterer's agent for the cargo place the crew movement with us as protecting agent, so that the owner controls the arrangement and the account.

A note on Maputo itself: much of the bulk trade is South African export cargo, so vessel nominations often come from charterers in Johannesburg rather than from Mozambique. The crew plan takes account of it.

What a crew change at Maputo includes

  • Crew list and joiner/leaver notification
  • Passport and seaman's book checks
  • Visa on arrival or advance visa guidance
  • Airport reception and baggage
  • Transfer to berth or launch pier
  • Licensed launch in daylight
  • Hotel bookings near the port
  • Immigration escort for departing crew
  • Flight changes when the vessel slips
  • Medical cases and fit-to-fly certificates
  • Standby Kenyan seafarers on request
  • Prompt report to the owner

The airport leg at Maputo

Movements at Maputo run through Maputo International Airport, close to the port. Joiners are met at the aircraft door where the airport allows it and at arrivals where it does not, and are through immigration and on the road without delay when the file was filed in advance. Leavers go the other way with their sign-off papers in hand.

Flight bookings track the vessel, not the other way round: options are held and changed as the ETA firms up, and the owner is told the cost of each change.

Ship agency attendance at Mombasa

Immigration and the file

Every nationality on the crew list is checked against the current rules at Maputo before a ticket is bought: who gets a visa on arrival, who needs one in advance, who transits on the agent's letter of guarantee alone. The crew list, passports and seaman's books are sent to immigration with the letter of guarantee ahead of the movement.

Shore passes are arranged for crew going ashore, and the boarding officer carries the port passes the movement needs.

Trucks and containers at the port

From the airport to the gangway

The last mile at Maputo is the gangway or the launch. Alongside, the boarding officer walks the crew through the gate. At anchor, the launch goes out in daylight with the joiners and comes back with the leavers, and the desk confirms the ladder, the lee side and the timing with the master before it sails.

Off-port-limits crew changes for vessels in transit are done outside the port, with the vessel slowing to take the launch alongside and resuming passage within a couple of hours. Hotels near the port are used when flights land after the last launch.

Ship inspection at Mombasa

Hospital, repatriation and the relief

A seafarer landed sick at Maputo is taken to hospital by the desk's representative, admitted against the owner's or the club's guarantee, and reported on daily until discharged or repatriated with a fit-to-fly certificate and, where required, a medical escort. The replacement is arranged from the Kenyan pool while the case runs.

Times, names and costs go to the owner promptly; receipts follow with the account.

Container cranes at a terminal

Who changes crew at Maputo

Maputo sees bulk carriers, container ships, car carriers, tankers and cruise ships. The desk plans a two-person officer swap on a bulk carrier and a twenty-person rotation on a purse seiner with the same file discipline, scaled to the numbers: more vehicles, more hotel rooms, a larger launch, and immigration warned of the size of the movement.

The port's working areas are the container, general cargo and car terminals at Maputo, and the bulk terminals at Matola for coal, grain, ferrochrome and magnetite, and the gate the crew use depends on the berth the vessel is given.

Bagged cargo in bulk bags discharged at Mombasa

Who places crew changes at Maputo with Maingate

Owners and operatorsEvery joiner and leaver reported promptly.
Ship managersStanding crew arrangements for the fleet.
Crew managers and manning agentsTheir seafarers met, moved and handed over.
Offshore, fishing and cruise operatorsRotations in numbers, on schedule.
Clubs and correspondentsMedical and repatriation cases with reporting.
MastersOne number to call when a flight is late.

Arranging a crew change at Maputo

  1. Send the nominationVessel, ETA, cargo or purpose, principal and the services needed, to the desk by email.
  2. Approve the proforma DAThe desk replies with the itemised estimate and the pre-arrival checklist; the principal approves and remits the advance.
  3. The call runsPre-arrival notices, berth and pilot, boarding officer, daily reports, statement of facts.
  4. The account closesFinal DA with receipts, reconciled against the advance, within the agreed period.
Agreed in writing firstScope, fee and reporting confirmed by email before the vessel arrives, so nothing is assumed.
Daily reports that say what happenedTimes, quantities, stoppages and reasons, sent while the call is running rather than after.
Statement of facts to a laytime standardRecorded so that the owner's and the charterer's calculators can rely on it.
Final account within the agreed daysReconciled against the proforma and the advance, with the balance shown plainly.

Before you send crew to Maputo

How much notice does a crew change at Maputo need?

A few working days is comfortable for most nationalities once the ETA is firm; longer where a visa must be obtained in advance. The desk confirms the requirement when the crew list is received.

Can crew change at the Maputo anchorage?

Yes, by licensed launch in daylight and acceptable weather.

Which airport is used for Maputo?

Maputo International Airport, close to the port.

Do you arrange replacement crew?

Yes. Kenyan officers and ratings are placed through our crewing desk in Mombasa with verified documents, and delivered to the vessel at the port of joining.

The Vessel Does Not Care Who the Agent Is. The Account Does.

Receipts behind every line, a record behind every stoppage, a desk behind every call.

Nominate by emailWhatsApp the desk

Other desks that belong with this one

Desks that usually follow a Maputo crew change.

Also on maingateshipping.com: Ship agency at Mombasa · Ship agency and charter brokers · Ship brokerage · About Maingate · Contact

Maingate Shipping Limited · Express Building, Moi Avenue, Mombasa, Kenya · ops@maingateshipping.com · +254 784 622 091