Joiners and leavers
Joining and leaving crew at Ain Sokhna, Egypt, move through Cairo International Airport to the gangway or the launch on one instruction to Maingate Shipping, with the file cleared before the flight is bought. Attendance is by our partner agent under Maingate's instruction; the Mombasa desk plans the movement and reports it.

Seafarers join and leave at Ain Sokhna through Cairo International Airport, about two hours by road, and the movement is routine when the file is right. Maingate Shipping handles the immigration formalities, the airport, the transfer to the gangway and the hotel if the timings do not meet, and reports every movement to the owner with times and costs.
Ain Sokhna is the Gulf of Suez on Egypt's Red Sea coast, south of the canal's southern entrance, and the port sits inside an industrial zone with its own access rules, and many calls are tied to the factories and power plants around it; the crew plan is built with that in mind, so that a launch is not booked into a swell or a flight into a berth window that will not hold.
Crewing agencies, technical managers and owners under charter all place crew movements here; the desk acts for whoever instructs it and keeps that party's account separate.
The airport for Ain Sokhna is Cairo International Airport, about two hours by road. Joining crew are met on arrival, taken through immigration on the agent's pre-notification, and driven to the port or the launch pier. Leaving crew are collected from the gangway, taken through immigration with their sign-off documents and checked in for their flight.
Flights are held until the ETA is firm and rebooked without fuss when the vessel slips; a crew change fixed to an optimistic ETA is the commonest way a movement fails.

The file that makes a crew change at Ain Sokhna work: passports valid for the period immigration requires, seaman's books or seafarer identity documents, the vessel's crew list with the joiners and leavers marked, the letter of guarantee from the agent, and the visa position for each nationality confirmed with immigration for this movement, not assumed from the last one.
The desk files the notification before the flight lands so that the seafarer is expected at the desk rather than explained at it.

At berth the movement is a walk from the gate to the gangway. At the anchorage, a licensed launch is booked for daylight and acceptable weather, and the pilot ladder and the vessel's own arrangements are confirmed with the master beforehand. Where a flight lands after the last launch, a hotel near the port is booked and the transfer runs at first light.
Off-port-limits crew changes for vessels in transit are done outside the port, with the vessel slowing to take the launch alongside and resuming passage within a couple of hours.

Medical cases at Ain Sokhna follow one rule: the seafarer sees a doctor first and the paperwork follows. Hospital, guarantee, daily reports to owner and club, fit-to-fly certificate, escort and flight home are the desk's work; the vessel's schedule is kept by arranging a replacement in parallel.
The owner receives a prompt report of each movement, and the DA carries the receipts.

Ain Sokhna sees container ships, bulk carriers, tankers, gas carriers and project vessels. The desk plans a two-person officer swap on a bulk carrier and a twenty-person rotation on a purse seiner with the same file discipline, scaled to the numbers: more vehicles, more hotel rooms, a larger launch, and immigration warned of the size of the movement.
The port's working areas are the container terminal, the dry bulk berths, the liquid bulk and petrochemical jetties and the industrial zone quays, and the gate the crew use depends on the berth the vessel is given.

Yes. The airport is Cairo International Airport, about two hours by road, and the port accepts crew movements at berth and at anchorage.
The owner or manager who instructs the desk; costs are itemised with receipts in a separate crew account or in the DA, and each movement is reported promptly.
Yes. Owners place crew movements with the desk as protecting agent while the charterer's agent handles the cargo.
Yes. Kenyan officers and ratings with verified documents are placed through the Mombasa crewing desk and delivered to the joining port.
One instruction, one account, one contact for the master and one for the principal.
Desks that usually follow a Ain Sokhna crew change.
Also on maingateshipping.com: Ship agency at Mombasa · Ship agency and charter brokers · Ship brokerage · About Maingate · Contact
Maingate Shipping Limited · Express Building, Moi Avenue, Mombasa, Kenya · ops@maingateshipping.com · +254 784 622 091