Welcome to MainGate Shipping LLC

Phone Number
+254784622091
Send us mail
ops@maingateshipping.com
Visit our location
Moi Avenue Road, Mombasa
Visit our location
Moi Avenue Road, Mombasa
Send us mail
ops@maingateshipping.com
Phone Number
+254784622091

Crew Changes at Dakar, Senegal: Immigration, Airport and Gangway on One Instruction

Joiners and leavers

Crew Changes at Dakar, Senegal: Immigration, Airport and Gangway on One Instruction

Maingate Shipping arranges crew changes at Dakar for owners, managers and crewing agencies: immigration formalities, airport meet and transfer through Blaise Diagne International Airport, about an hour from the port, launches where the vessel lies at anchor, and hotels when flights and vessels do not line up. Our partner agent at the port attends the movement under Maingate's instruction; the Mombasa desk plans and reports.

Nominate MaingateWhatsApp the deskContact

Boarding officer on a ship inspection
PortDakar
AirportBlaise Diagne International Airport
Crew changesRoutine
Anchorage changesBy launch, daylight

For vessels calling Dakar, the crew change is planned before the cargo is: flights are held until the ETA is firm, immigration is pre-notified, and the joining crew are met at Blaise Diagne International Airport and taken to the gangway or the launch. Off-port-limits changes for vessels in transit are done the same way, without the vessel entering the port.

The port's geography matters: the westernmost port in Africa, on the Cape Verde peninsula. So does the fact that Dakar's position on the Atlantic routes makes it a habitual bunkering, repair and crew change stop, and the deep-water port under construction to the south will reshape the traffic.

Every movement is confirmed in writing before the seafarer travels and reported promptly it happens.

What a crew change at Dakar includes

  • Letters of guarantee to immigration
  • Nationality-by-nationality visa check
  • Meet on landing, escort through immigration
  • Vehicle and gate passes for the port
  • Anchorage transfer by launch
  • Overnight accommodation when needed
  • Sign-off documents prepared with the master
  • Onward flights rebooked as required
  • Lost passport and emergency travel documents
  • Replacement crew arranged in parallel
  • Times and names reported promptly
  • Costs with receipts in the DA

The airport leg at Dakar

The airport for Dakar is Blaise Diagne International Airport, about an hour from the port. Joining crew are met on arrival, taken through immigration on the agent's pre-notification, and driven to the port or the launch pier. Leaving crew are collected from the gangway, taken through immigration with their sign-off documents and checked in for their flight.

Flights are held until the ETA is firm and rebooked without fuss when the vessel slips; a crew change fixed to an optimistic ETA is the commonest way a movement fails.

Mombasa port, Kilindini Harbour

Passports, visas and letters of guarantee

Every nationality on the crew list is checked against the current rules at Dakar before a ticket is bought: who gets a visa on arrival, who needs one in advance, who transits on the agent's letter of guarantee alone. The crew list, passports and seaman's books are sent to immigration with the letter of guarantee ahead of the movement.

Shore passes are arranged for crew going ashore, and the boarding officer carries the port passes the movement needs.

Maingate Shipping agents attending a vessel at Mombasa port

The last mile to the vessel

Berth changes at Dakar are simple: the agent's vehicle, the gate pass, the gangway. Anchorage changes need a launch, daylight, a sea state the launch operator accepts and a pilot ladder rigged to the master's satisfaction. The desk books the launch against the tide and the weather and tells the master the time it will be alongside.

When the aircraft and the launch cannot meet, a hotel room near the port bridges the gap and the movement runs at first light. Off-port-limits crew changes for vessels in transit are done outside the port, with the vessel slowing to take the launch alongside and resuming passage within a couple of hours.

Container ship from above

Medical cases and replacements

Sick or injured crew are taken to hospital with an agent's representative, the owner and the P&I club are informed promptly, and repatriation with a medical escort is arranged when the doctor allows travel. Replacement seafarers are arranged in parallel from Kenya through our crewing desk so that the vessel does not sail short.

Every movement is reported to the owner with the times, the names and the costs, and the receipts follow in the DA.

Trucks and containers at the port

Who changes crew at Dakar

Who changes crew at Dakar: container ships, bulk carriers, tankers, fishing vessels, cruise ships and naval vessels, in the trades of containers, wheat, rice, fuel and clinker inbound, with phosphates, groundnut products and fish outbound. Their rotations differ, so the desk asks the manager for the rotation calendar and works from it, rather than treating every movement as a surprise.

Berth or anchorage decides the last mile; Dakar's working areas are the container terminal, the general cargo and bulk berths, the refinery jetty, the fishing harbour and the ship repair yard.

Mombasa waterfront

The desk's principals at Dakar

Ship managersFleet crew rotations planned across the itinerary.
Owners under charterCrew movements kept on the owner's account as protecting agent.
Crewing agenciesJoining and leaving handled for their seafarers.
Fishing and offshore operatorsLarge multinational crews on rotation.
P&I clubsMedical and repatriation cases.
Cruise operatorsCrew rotations during passenger calls.

The movement in four steps

  1. NominateOne email with the vessel's particulars, the ETA and what the call is for.
  2. PrepareProforma DA, authority notices, berth and receiver readiness, crew and stores planned.
  3. AttendBoarding officer at arrival, operations followed hour by hour, the master supported.
  4. CloseDeparture report, statement of facts, final DA with every receipt.
Agreed in writing firstScope, fee and reporting confirmed by email before the vessel arrives, so nothing is assumed.
Daily reports that say what happenedTimes, quantities, stoppages and reasons, sent while the call is running rather than after.
Statement of facts to a laytime standardRecorded so that the owner's and the charterer's calculators can rely on it.
Final account within the agreed daysReconciled against the proforma and the advance, with the balance shown plainly.

Dakar crew changes: what owners ask

How much notice does a crew change at Dakar need?

A few working days is comfortable for most nationalities once the ETA is firm; longer where a visa must be obtained in advance. The desk confirms the requirement when the crew list is received.

Can crew change at the Dakar anchorage?

Yes, by licensed launch in daylight and acceptable weather.

Which airport is used for Dakar?

Blaise Diagne International Airport, about an hour from the port.

Do you arrange replacement crew?

Yes. Kenyan officers and ratings are placed through our crewing desk in Mombasa with verified documents, and delivered to the vessel at the port of joining.

A Port Call Is a Hundred Small Decisions. Make Them With One Desk.

One instruction, one account, one contact for the master and one for the principal.

Nominate by emailWhatsApp the desk

Other desks that belong with this one

Crew work sits with port agency and crew management on the same desk.

Also on maingateshipping.com: Ship agency at Mombasa · Ship agency and charter brokers · Ship brokerage · About Maingate · Contact

Maingate Shipping Limited · Express Building, Moi Avenue, Mombasa, Kenya · ops@maingateshipping.com · +254 784 622 091